🏗️ Built for Construction

Scope creep is eating
your profit margin.
And you can't prove it.

The homeowner says "while you're here, can you also..." and you said yes without a change order. Now you're three days over schedule, $4,000 over budget, and there's no paper trail. Sound familiar?

MTQ Now turns job site notes and voice recordings into professional scope of work documents, change orders, and daily reports in 30 seconds.

Try It Free — No Sign Up See Before & After
30s
Per Document
Zero
Scope Creep
100%
CYA Every Time

The Real Problem

You build things right.
Your paperwork says otherwise.

Construction disputes cost American contractors $15 billion a year. Most of them come down to one thing: documentation. When the scope wasn't clear, when the change wasn't signed, when the daily log was "in your head" — you lose. Every time.

📋

Scope Creep Without Paper

"Can you just move this wall?" turned into two weeks of extra work with no signed change order. Customer expects the original price. You eat the difference.

💸

Bids That Lose to Lowballers

Your bid was fair and detailed — in your head. On paper it was three lines. The other guy had a 4-page proposal with scope, timeline, and exclusions. He won at a higher price.

⚖️

Disputes Without Evidence

Customer says the work wasn't done to spec. You know it was. But your daily log is a text to your foreman that says "framing done, starting drywall tomorrow." Good luck in mediation.

⏱️

Paperwork After Hours

You're on the job site all day. Paperwork happens at 9 PM at the kitchen table — if it happens at all. That's time you should be spending with family or resting for tomorrow.

See the Difference

Same change. One gets paid.
One gets a lawsuit.

❌ What the contractor texted

HOMEOWNER WANTS TO ADD A SLIDING DOOR WHERE THE WINDOW IS IN THE MASTER. GONNA NEED TO REFRAME THE OPENING AND PROBABLY MOVE SOME ELECTRICAL. TOLD HER ITS GONNA BE EXTRA BUT DIDNT GIVE HER A NUMBER YET. ALSO THE TILE SHE PICKED IS BACKORDERED SO BATHROOMS GONNA BE DELAYED

⚠️ No cost impact. No timeline impact. No signature. This is a conversation, not a document. Six months from now, nobody remembers what "extra" meant.

✅ What MTQ Now generates
Change Order #003

Project: [Address] — Master Suite Renovation
Original Contract: CO-2026-0147

Change Requested:
Homeowner requests replacement of existing master bedroom window with a sliding patio door.

Scope of Additional Work:
1. Remove existing window and frame
2. Reframe opening to accommodate sliding door (structural header required)
3. Relocate electrical outlet and switch affected by new opening
4. Install sliding patio door (homeowner to select model)
5. Exterior siding repair and weatherproofing at new opening
6. Interior trim and finish work

Cost Impact: +$3,200 (labor and materials, door cost TBD by selection)
Timeline Impact: +3–4 working days

Note: Bathroom tile selected by homeowner is currently backordered. Bathroom completion will be delayed approximately 2–3 weeks pending material availability. This does not affect other areas of work.

Work will not proceed without signed authorization. Changes to original contract scope are billable as outlined above. Customer was advised of all cost and timeline impacts.

Customer Signature: _____________ Date: _________

Every document your
construction business needs.

From initial proposals to punch lists. Pick a type or let AI figure it out.

📐

Scope of Work

Detailed project scope with inclusions, exclusions, timeline, and payment milestones. Prevents every dispute before it starts.

📝

Change Orders

Customer wants to add, remove, or modify something? Document the cost and timeline impact. Get it signed before you touch a tool.

💰

Proposals & Estimates

Professional proposals that explain the work, the timeline, and the value. Win jobs at higher prices because your paperwork earns trust.

📋

Inspection Reports

Pre-construction assessments, progress inspections, and punch lists with clear findings and photos references.

📊

Daily Logs

Record what happened on site today — weather, crew, work completed, materials used, issues encountered. Your future self will thank you.

Declined Work Records

Customer declined a recommendation? Foundation issue they don't want to fix? Document it. This is your protection when they call back.

🏗️

Stop letting scope creep
eat your margins.

Professional documentation in 30 seconds. From the job site, from the truck, from the kitchen table at 9 PM. Free to try.

Try It Free — Right Now